Remove Commissioning Remove Drawings Remove Overhead Remove Remodeling
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Rory Woolseys Construction Estimating Blog. Construction Estimating One Bite at a Time.

article thumbnail

FEATURE STORY: High-Tech Hubs Are Moving To Their Markets

Buisness Facilities Contributed Content

The remodeled facility is slated to start mass production during the second half of 2013, mainly producing 28-nm system-on-a-chip (SoC) solutions for tablets and smartphones. Samsung’s total investment in Austin now exceeds $13 billion. We’re very hopeful that we can grow the biosciences here and the CROs are a part of that.”.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Standard Tools – Basic. Application 1.