Remove Commissioning Remove Feasibility Remove Leases
article thumbnail

Implementing an ‘asset drawdown strategy’ for site decarbonization

BD+C

The trend toward electrification is being accelerated by upcoming Securities and Exchange Commission reporting requirements for large publicly traded companies as well as by the ongoing greening of the grid. The green power market, a subset of the larger electricity market in the U.S.,

Site 98
article thumbnail

Top 10 Companies for Environmental Engineers to Work For

CivilJungle

Our services include spare parts supply, and build-own-operate (BOO) and maintenance contracts, technical audits, leased water treatment systems, technical training, and remote monitoring. Paramount also provides consultancy services in Air Quality Monitoring, Environmental Impact Assessments and Treatability & Feasibility Studies.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. Small Producer Credit (AS 43.55.024(c)): Credit of up to $12 million per year for taxpayers incurring eligible oil and gas lease expenditures in North Slope operations.

Income 108
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The principal and interest on the bonds are paid solely from the funds derived from leasing or selling the facilities to the user company. The program offers the following incentives: Transaction Privilege Tax Exemption (TPT Exemption) on purchased qualifying equipment and leased or rented qualifying equipment.

Income 75
article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

The P3 project is a 50-year agreement between the Maryland Port Administration (MPA) and Ports America Chesapeake to lease and operate the 200-acre Seagirt Marine Terminal. Army Corps of Engineers is expected to issue a final report on the feasibility of the project in April 2014. The project must then be presented to U.S.

article thumbnail

BUSINESS REPORT: Texas – Innovation Moves Front And Center In Austin

Buisness Facilities Contributed Content

The City intends to create a financially feasible, operationally self–sustainable signature facility that will promote economic development, create jobs and enhance educational offerings. Highway 59 and University Boulevard, with a letter of intent with ACE SL, LLC was approved in August by the Sugar Land Development Corp.

Austin 73
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. When feasible the position of valves, air pressure, temperature, or water level being monitored should be altered to actuate the signals. Document anomaly reports from the persistence commissioning tool.