Remove Commissioning Remove Life Cycle Remove Modeling
article thumbnail

Suffolk Construction establishes Suffolk Sustainability Group

BD+C

His role encompasses the entire project life cycle. In design, Swenso collaborates closely with design teams to optimize strategies for cost effectiveness to meet operational carbon goals using life cycle costing. Mchael Swenson, Director of Sustainability at Suffolk Design.

article thumbnail

BIM for FM – What is COBie – A Section of Roadmap for Life-cycle Management of the Built Environment

Building Information Management

(Source: A report for the Government Construction Client Group Building Information Modelling (BIM) Working Party Strategy Paper March 2011). COBie data is accumulated throughout the life cycle. The principal use-case is therefore the handover of a facility after commissioning of the owner/operator.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Timeline to Zero: Actionable Steps to Achieve ILFI Zero Carbon Certification

Stok

Embodied carbon actions: As early as concept design, engage an LCA (life-cycle assessment) consultant to develop a baseline embodied carbon model. Refine and update the model throughout design, ensuring that the project achieves a 10% reduction over the baseline and an overall embodied carbon efficiency (<46.5

article thumbnail

Digital Builder Ep 36: Embracing BIM Throughout the Industry

Autodesk Construction Cloud

Building Information Modeling (BIM) is critical in keeping projects running smoothly. BIM gives contractors, engineers, and project managers an intelligent model for their built assets, enabling stakeholders to plan, collaborate, and execute the project effectively. . Simply put, BIM keeps everyone on the same page.

BIM 105
article thumbnail

The 3 Core Pillars for Redefining Construction Handover 

Autodesk Construction Cloud

It’s a continuous process with multiple stakeholders that spans across the life cycle. General contractors then conduct inspections, commission workflows, and approve the closeout documentation received from subcontractors. They need access to that information over the course of a building’s life cycle or a building’s lifetime.

article thumbnail

Life Science Building Design & Construction: 5 Considerations for Success

Stok

Liquidated damages are far more common for high-tech life science developers because these spaces must meet a high technical standard for incoming lab, pharma, and bio-tech tenants. Time is money and that concept is never truer than on a life science project.

Design 52
article thumbnail

Life Science Building Design & Construction: 5 Considerations for Success

Stok

Liquidated damages are far more common for high-tech life science developers because these spaces must meet a high technical standard for incoming lab, pharma, and bio-tech tenants. Time is money and that concept is never truer than on a life science project. 2: Labs are energy hogs (and that’s the beginning—not end—of the story).

Design 52