Remove Compensation Remove DOT Remove Drafting
article thumbnail

Severin Doctrine: It's Another Name for "Pass-Through-Plus" Claims

Best Practices Construction Law

Rhode Island DOT , the contractor on a bridge project had failed to include a material supplier in its list of vendors to the DOT. The subcontractor prepared an additional 70 shop drawings for total of 1,650 additional hours for which it sought additional compensation. The claim was presented by the contractor to the DOT.

Claims 48
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

For example, DOT has experienced similar success using multiple award contracts at its Volpe Center. The goal was to expedite the process of providing draft RFPs to industry and obtaining their feedback, a process which can take six months to a year to finalize. Use of Multiple Award Contracts to Buy Other Services.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

EPA/DOT approved refrigerant storage tanks. EPA/DOT approved refrigerant storage tanks. EPA/DOT approved refrigerant storage tanks. EPA/DOT approved refrigerant storage tanks. EPA/DOT approved refrigerant storage tanks. Draft regulators require slightly negative pressure in the combustion chamber at maximum input.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” Participating companies are compensated by being able to reduce their federal income tax liability with a tax credit between $1,200 and $9,000 per qualified employee, depending on the target group.

Income 108