Remove Compensation Remove Drawings Remove Overhead Remove Site
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). authorization.

Contract 100
article thumbnail

16 Things Every Contractor Should Know When Bidding a Job Order Contract

Job Order Contracting

For example, are drawings given to the general contractor 50% of the time? Information should include a description of current conditions including access, materials, dimensions, and a drawing/PDF, as well as a description and drawing/PDF of requirements. Learn more… 1. Information varies by Owner. 80 to 1.20 68 to 1.30

Bidding 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

This value usually does not include the preplanning, site or right of way acquisition, or design costs, and may not include start-up and commissioning costs. Field Supervision (or field non-manual) - supervisory personnel and all other non-manual staff at the construction site. See also Overhead, Indirect cost.

article thumbnail

Solving the Labor Shortage in 12 Steps

Pro Builder

Is there anything more important for an employer to do than ensure a safe site? If OSHA is active in your area, all builders are forced to pay attention to site conditions, which helps even the playing field. But even without OSHA enforcement, maintaining safe sites sends a message to your trades that you care.

Schedule 119
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Offerors propose coefficients for costs such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Coefficients may include bands or ranges based on dollar levels, standard and non-standard hours, range or isolated site work, or work in secured areas. Site visit.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. The Owner will be required to deliver such materials to the job site or compensate the Contractor for providing labor to deliver Owner-furnished materials to the job.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. Application This applies to large trash compactors set an the site to handle building waste. Recommended Tools, Materials, and Equipment: 1. Application 1.