Remove Compensation Remove Insurance Remove Materials Remove Profitability
article thumbnail

Creating a JOC Coefficient?

Job Order Contracting

Materials. General / Prime Contractor Profit and risk. General insurances. Workmen’s compensations insurance. Workmen’s compensations insurance. State unemployment insurance. Federal unemployment insurance. Shipping of all materials to the jobsite. Equipment.

Insurance 232
article thumbnail

2020 Guide to Construction Cost Estimating

Job Order Contracting

liability insurance and allowance for small tools and consumables. Material costs are either. Markups include worker compensation and unemployment per state in which work is performed. Liability insurance based upon local contractor rates is also added as a percentage. Material Costs. General Conditions.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Insurance for Electricians: What It Covers & Why You May Need It

Levelset

Scenarios like these stress the need for an electrician to have insurance coverage in place. Thus, a strong insurance plan helps you rest easier both on and off the job. Why can an electrical contractor use insurance? A series of small mishaps like these could put a dent in your profit margins from year to year.

article thumbnail

Job Order Contracting Training Note – JOC Coefficient

Job Order Contracting

home office overhead; insurance, bonds, and indemnification; project meetings, training, management and supervision; mobilization and close-out for the contract and each Project/Job Order; project office staff and equipment; profit; subcontractor’s overhead and profit; all taxes for which a waiver is not available including material sales tax (..)

Contract 100
article thumbnail

Job Order Contracting Guide

Job Order Contracting

GENERAL – Cost data is organized using MasterFormat2004+ [1] and includes detailed line item description and associated material, equipment and labor as appropriate. BEST VALUE – As noted, all unit price line item provided incorporate locally research labor, material, and equipment costs.

Contract 100
article thumbnail

Estimating- The New Normal

Chianelli Estimating

Most likely none of the cost factors now required will have been budgeted for on previously awarded contracts and the list is formable; controlled access to sites, material delivery disruptions, temperature checks, two week quarantine, reduced labor force – both in the field and in the office, material shortages. cost overruns.

article thumbnail

Top 8 Construction Health and Safety Hazards — and Ways to Protect Your Jobsite

Levelset

Head, neck, or bodily injuries and death most often occur when workers use power tools, walk beneath elevated work areas, and situate themselves near improperly stored building materials. Manual material handling. Financial distress can result from a lack of skilled labor and possible workers’ compensation insurance claims. .

Safety 52