Remove Compensation Remove Negotiation Remove Security
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. approve or disapprove the JO, negotiate, or advance to another contractor. (4)

Contract 100
article thumbnail

Slow As A Turtle? Florida Court Finds “No Damages for Delay” Clause Has Limits

Best Practices Construction Law

The contractor secured an engineer’s report that concluded the damage was cosmetic only and that the vibration did not exceed the acceptable threshhold. The contractor sought additional compensation for the two extra months of suspension. The adjacent homeowner rejected the contractor’s offer to fix the damages.

Florida 62
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

PBS&J in turmoil?

PSMJ Resources

PBS&J will make that payment to Zumwalt in 24 monthly installments, according to a filing with the Securities and Exchange Commission. He will be reimbursed $20,000 for legal fees incurred with negotiation and review of the agreement. The biggest chunk of the separation agreement is a $900,000 transition payment.

article thumbnail

Navigating the Waters Beyond Construction Law: Unveiling the Ties Between Construction and Maritime Liens

Federal Construction Contracting Blog

Just as construction liens secure your rights to payment for work done on real property, maritime liens secure debts related to services provided on or for vessels. Therefore, it is critical to review your agreements with a careful eye to such provisions and attempt to remove them during negotiations.

Lien 52
article thumbnail

With Inflation, How Can We Help Construction Costs Stay Down?

Fieldwire

It enables you to mitigate security threats, safety hazards, equipment damage and even human error. It creates full trust and transparency in online transactions, helping you safely execute contract negotiations and removing the need for expensive intermediary third parties. While the cost of rework hovers around 2.4%–12.4%

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Coefficients may include bands or ranges based on dollar levels, standard and non-standard hours, range or isolated site work, or work in secured areas. The Task Order price is the product of required tasks, quantity, unit of issue, UPG price per unit, and the coefficient plus the negotiated price for any non-priced items (NPI).

article thumbnail

Additional Insured Endorsements & How They Work in Construction

Levelset

In short, an additional insured is typically another business entity or person who can be added to your business policy, securing the same liability protection that you do. Understanding the mechanics of additional insured endorsements will give you some confidence with contracts and negotiations. Your bottom line.