Remove Concrete Remove Documentation Remove Drawings Remove Subcontracting
article thumbnail

How to Do a Takeoff in Construction: A Step-by-Step Guide   

Autodesk Construction Cloud

At both general contracting and subcontracting firms, construction takeoffs are typically done by estimators to determine the material, labor, and equipment costs to generate an accurate and competitive bid. . They also draw from their experiences from previous successfully completed projects to identify savings. QTY: 1000 .

article thumbnail

One Source of Truth Enabling Better Collaboration and Quality for POB in Norway

Autodesk Construction Cloud

POB delivers new build projects, rehabilitation projects, concrete work, smaller service projects as well as repair services to their varied client base in Norway. However, there was no common platform and no central storage place for all important project documents. Reducing time lost searching for documents.

BIM 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What Is Estimation of Residential Building | Types of Estimation for Residential Building

CivilJungle

With a Mix of 1:5:10 for Foundation: After that plain cement concrete is needed with a mixture of 1:5:10 for the foundation purpose and the unit of this is also meter cube. Dummy Concrete With a Mix of 1:3:6: This is not always used in the residential building purpose but we need to calculate this in our measurement. are connected.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at. JOB ORDER CONTRACT (JOC) EXECUTION GUIDE. the time of award.

Contract 100
article thumbnail

Behind the Build: Interview with Matthew Keck, BIM Manager at Metromont 

Autodesk Construction Cloud

Tell me a little bit about Metroment and what you specialize in Metromont specializes in producing precast concrete products designed, engineered, and produced here in Greenville, SC and surrounding areas. Here in Greenville, we subcontract the erection, but we oversee it. Let’s dive in. We put them together with instructions.

BIM 98
article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

Individual task orders generally include drawings, detailed unit prices, and reference specifications. A job order (JO) or task order (TO) is the contractual document issued by the purchasing/procurement or its designated representative to the Contractor. Subcontracts. Job Orders / Task Orders.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Procurement and Contracting Requirements Group (Division 00): Introductory Information: Indexing and general information documents. 00 01 15 List of Drawing Sheets. Measured Drawing Information. Existing Concrete Information. 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. Requirements.