REINFORCEMENT COVER AND PRE-CONCRETE CHECKS

The Constructor

When the formwork is erected the concrete can be poured. When the concrete has reached the required strength the formwork can be poured. If the steel had been placed too close to the surface and the concrete had been poured then over time the steel may become exposed to moisture and corrosion will commence.

Concrete 250
article thumbnail

PRE-CONCRETE CHECKS FOR FORMWORK & RELEASE AGENTS

The Constructor

Formwork pressures are function of height (including the height from which concrete is dropped into the forms) and are affected by concrete workability, rate of stiffening and rate of placing. Exceeding this limit may lead to unacceptable formwork deflections, loss of grout / concrete at joints, or even collapse.

Concrete 235
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

FORMWORK AND GOOD FORMWORK PROPERTIES

The Constructor

When concrete is fresh and in its liquid state it must be restrained within a mould in order for it to set in its required shape. A smooth outer surface provides the main support for the concrete as it sets. Concrete is approximately 2.4 Formwork is the term used to describe this mould. This is normally made of plywood.

Concrete 223
article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

8) inadequate preparation and review of contract and shop drawings. (9) Other common causes of structural failure are: (5) lack of appropriate professional design and construction experience, especially when novel structures are needed. (6) 6) complexity of codes and specifications leading to misinterpretation and misapplication. (7)

Concrete 230
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Here the data is fed into the agency’s database such that it can gain an overall picture of the state of the bridge and calculate an estimate of likely future expenditure. For instance, the concrete sub and superstructure should not need replacing during 120 year design life. A little minor maintenance should suffice.

article thumbnail

FIXING OF PRECAST CLADDING

The Constructor

These fixings generally take the form of concrete nibs or metal (usually stainless steel) angles. Restraint fixings are designed to hold panels back and transfer all horizontal forces (such as wind pressure or suction) to the structure.

Concrete 192
article thumbnail

Construction Estimating Software: The Complete Guide 

Autodesk Construction Cloud

New opportunities and challenges highlight the importance of producing accurate estimates. In an industry with razor-thin margins, incorrect estimates can lead to a major hit in profitability and wreak havoc on your company’s finances. One of the best ways to do this is to use construction estimating software. .