Remove Consulting Remove Drafting Remove Negotiation
article thumbnail

Illinois Federal District Court Enforces Partially Executed Agreement to Arbitrate

Constructlaw

SGLC Consulting LLC , No. Subcontractor Spirtas Worldwide LLC filed a Miller Act claim against contractor SGLC Consulting LLC to recover the cost of materials provided and labor performed on a project for the U.S. United States ex rel. Spirtas Worldwide, LLC v. 3:21-CV-00182-MAB, 2022 U.S. LEXIS 105589; 2022 WL 2116451 (S.D.

article thumbnail

Illinois Federal District Court Enforces Partially Executed Agreement to Arbitrate

Constructlaw

SGLC Consulting LLC , No. Subcontractor Spirtas Worldwide LLC filed a Miller Act claim against contractor SGLC Consulting LLC to recover the cost of materials provided and labor performed on a project for the U.S. United States ex rel. Spirtas Worldwide, LLC v. 3:21-CV-00182-MAB, 2022 U.S. LEXIS 105589; 2022 WL 2116451 (S.D.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Specifications for design-build projects

Construction Specifier

A substantial challenge faced by professionals preparing construction specifications for design-build projects is most master specifications were developed for traditional DBB or its ‘close relation,’ design-negotiate-build (DNB).

Design 52
article thumbnail

Coordinating specifications with an owner’s Division 00

Construction Specifier

In other instances, mixing different items can have adverse results, and may need expert guidance (the author acknowledges the advice and comments on drafts of this article from Gerard Cavaluzzi, Esq., vice-president and general counsel at Kennedy/Jenks Consultants, Inc., New York).

article thumbnail

Arbitration including Religious Arbitration in Green Building Contracts

Green Building Law Update

There is little question that a properly drafted provision in a contract requiring arbitration is enforceable. The take away from all of this may be to pay particular attention to and negotiate the dispute resolution provisions in contracts. And always consult your attorney before signing.

Green 120
article thumbnail

Arbitration is Why There is So Little Litigation in Green Building

Green Building Law Update

And there is no question that a properly drafted provision in a contract requiring arbitration is enforceable. The take away from all of this should be in an effort to manage your risk, pay particular attention to and negotiate the dispute resolution provisions in your contracts. And always consult your attorney before signing.

Green 120
article thumbnail

Specifications for design-build projects

Construction Specifier

A substantial challenge faced by professionals preparing construction specifications for design build projects is most master specifications were developed for traditional DBB or its ‘close relation,’ design-negotiate-build (DNB). Greater challenges arise when adapting DBB source documents for design-build.

EJCDC 52