Remove Consulting Remove Negotiation Remove Resource
article thumbnail

Job Order Contracting Consulting Services

Job Order Contracting

While a JOC consultant can be used to support initial development of a Job Order Contract and ongoing support services… under NO CIRCUMSTANCES should a JOC consultant be paid a percentage of the JOC construction volume if said JOC consultant in involved in approving or denying JOC projects.

article thumbnail

Digital Dryshack #87: 10 Reasons D.O.D. Schedules get Rejected

Cassell Construction Estimating

These 2 rules are absolutely non-negotiable: Every Activity but the first (Contract Award) must have a Predecessor. Cost Loading incomplete, or not using Resource based on Labor Units. If not the first time, shortly after negotiating a few minor adjustments – Barry Cassell. incorrect or incomplete. must be Project level).

Schedule 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

December 2014 newsletter

FDR Safety

Department of Labor to see if you can arrive at a negotiated settlement. (Do If no negotiated settlement can be reached, the next step is a proceeding with a hearing officer, which usually takes place within 9 to 12 months. Technical and consulting support. Do you need an OSHA lawyer?

OSHA 120
article thumbnail

Why Some Job Order Contracts Fail

Job Order Contracting

As a result backlogs seem to always grow and resources always inadequate to satisfy facility user needs. Focus must be upon negotiation and mutually satisfactory resolutions. Consultants can assist in this progress, however, consultants should not be solely responsible for a JOC program.

Contract 100
article thumbnail

PSMJ Resources Blog: 6 Common Project Management Practices of.

PSMJ Resources

Throughout the course of teaching PSMJ’s PM Bootcamps, PSMJ consultants have identified the activities and approaches firms have taken which have led to success, and have developed an understanding of what lower-performing firms can do to change and put themselves on track for greater success. PSMJ Resources, Inc. What we read.

article thumbnail

Job Order Contracting – Recommended Best Practices

Job Order Contracting

Conduct a strategic review of your organization’s facilities/infrastructure repair, renovation, maintenance, sustainability, and minor new construction requirements, including a gap analysis of current process and issues and desired outcomes as well as current and required resources. Place limits on the use of non-prepriced line times.

Contract 100
article thumbnail

Home Builder Profitability Reached Highest Level on Record

Pro Builder

Last year’s net profit average for builders reached the highest level since management consulting firm The Shinn Group began tracking net income data in 1994. The second component is the management of resources to achieve efficiencies and effectiveness through systems, processes and procedures. cbroderick. Mon, 07/26/2021 - 10:00.