Remove Consulting Remove Overhead Remove Schedule
article thumbnail

Viewpoint: The Case for Neutral, Third-Party Schedulers | ENR.

ENR Construction

Survey Schedule. Viewpoint: The Case for Neutral, Third-Party Schedulers. Website of PKR Consulting Inc. -- Advertising --. I was recently asked to participate in a debate on scheduling specifications at Stanford University. Contractors routinely ignore scheduling specifications and their own CPM schedules.

article thumbnail

HOW SAFE IS YOUR BUSINESS?

Safety Services Company

Creating new processes that are more efficient, and reducing material costs and overhead are critical parts of the profit equation, but cutting corners and skimping on safety are not. A frequently overlooked resource for improving your workplace safety is to take advantage of the OSHA consultation program.

OSHA 67
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Rise of Business Intelligence in Construction

Viewpoint Construction Technology

Bringing in historical data from other projects will help more accurately identify efficiencies that can be gained in current projects — pointing managers to the suppliers who have provided the highest-quality materials in the past or letting firms map out more effective and efficient building phase schedules in the field.

article thumbnail

How Much Does Rework Really Cost Your Job and What Can You Do to Stop It?

Construction Junkie

Unsatisfied with stopping at direct cost, the researches at Navigant then turned their attention to overhead costs, which include managerial, supervisor, and site safety costs. Review of Constructability Hiring an independent contractor or consultant is recommended to review all construction documents prior to start of construction.

article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

The proposal shall also contain a schedule for the completion of a specific project scope of work as requested by the organization. The proposal may also contain approved drawings, work schedule, permits, or other documentation as the organization may require for a specific job order. The prices shall not include overhead and profit.

article thumbnail

Analysis of rates for building works

Construction Cost Estimating

Labor , materials , machinery, transport, overheads and profit). Labour cost Charges of using water Taxes Risk and insurance coverages Profit and overheads Some other important points: Percentage of profit is 5-10 per cent. But the overhead is normally 3 - 7.5 Indirect cost is those of consulting charge or out source changes.

article thumbnail

Electrical Utility Construction Estimator

Construction Cost Estimating

Estimating experience on electrical utility projects in the following construction and maintenance areas is preferred: Distribution, Overhead Distribution, Underground Substation Transmission We are looking for a project estimator with strong time management skills and who is team-oriented. Overnight travel may be required.