Remove Contract Remove Documentation Remove EJCDC
article thumbnail

Insider Discusses EJCDC's New Document on Subcontracts

Construction Dive

Here is the summary for the October 2013 addition: One of the new documents that the Engineers Joint Contract Documents Committee (EJCDC) has added is “C-523,” which addresses subcontracts. Read more.'

EJCDC 48
article thumbnail

Expert Discusses Recent Changes to EJCDC’s Standard Contract Documents

Construction Dive

The document’s provisions addressing insurance represent one of the four categories containing the “most significant” changes made to C-700, a document that he characterized as “the lynchpin” within the organization’s Construction Series of documents. ” Read more.'

EJCDC 48
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Specifications for design-build projects

Construction Specifier

Greater challenges arise when adapting DBB source documents for design-build. The contractor is required to build the project in complete compliance with the drawings, specifications, and other contract documents (Figure 1). Prime contract between the owner and design-builder. Images courtesy HDR.

EJCDC 52
article thumbnail

#111:  The "One Year" Warranty: Myth and Reality

NH Construction Law

A common misperception among commercial contractors, particularly those who use standard form contracts, is that their warranty obligations only last for a year. No time limitation is included in these clauses, so the general statute of limitations for contract cases applies (in New Hampshire, three years from discovery of the defect).