Remove DC Remove Electrical Remove Railroad
article thumbnail

I've been working on the railroad.

Do

I was able to rig up some temporary wiring and thanks to the acquisition this summer got a DC locomotive up and running on temporary track. Lots of things going in life, but in the last week+ I've found a few moments to put some time in. Lorenzo loved it. Currently it looks like my max train length will be ~6 1/2'. in the future.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

AIEE: American Institute of Electrical Engineers. DC: Direct Current. ELEC: Electrical. ELECT: Electrical. EP: Electrical Panelboard, Explosion Proof. EWC: Electric Water Cooler. EW & C: Electric Wiring and Communication. EWH: Electric Water Heater. I: Iron, Current (electrical).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ASTM vs ASME Standards: Whats the Difference?

Work Gearz

Today, it is known as ASTM International with offices across the globe including one in Washington DC. The committee has expanded to setting quality standards of materials used in the construction of products, which includes chemical, mechanical, physical, and electrical properties too.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

AIEE: American Institute of Electrical Engineers. DC: Direct Current. ELEC: Electrical. ELECT: Electrical. EP: Electrical Panelboard, Explosion Proof. EWC: Electric Water Cooler. EW & C: Electric Wiring and Communication. EWH: Electric Water Heater. I: Iron, Current (electrical).

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

AIEE: American Institute of Electrical Engineers. DC: Direct Current. ELEC: Electrical. ELECT: Electrical. EP: Electrical Panelboard, Explosion Proof. EWC: Electric Water Cooler. EW & C: Electric Wiring and Communication. EWH: Electric Water Heater. I: Iron, Current (electrical).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. 01 51 13 Temporary Electricity. 01 86 26 Electrical Performance Requirements. 01 51 13 Temporary Electricity. 01 86 26 Electrical Performance Requirements. 01 89 26 Site Electrical Utilities Performance Requirements. Requirements. 00 01 03 Project Directory.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Electrical Resistivity Investigations Information. 01 51 13 Temporary Electricity. 01 86 26 Electrical Performance Requirements. 01 51 13 Temporary Electricity. 01 86 26 Electrical Performance Requirements. 01 89 26 Site Electrical Utilities Performance Requirements. Requirements. 00 01 03 Project Directory.