Construction Cost Estimating – Single Source of Truth

Job Order Contracting

There is only one sole source of truth for construction cost estimating, locally researched detailed line-item unit price data and associated quantities. GAO-22-104481 – DEFENSE INFRASTRUCTURE DOD Should Better Manage Risks Posed by Deferred Facility Maintenance.

article thumbnail

Area Cost Factors – Not a viable for Federal Construction Cost Estimating?

Job Order Contracting

Should Areas Cost Factors be used for Construction Cost Estimating? As a result, more than 40 years after the introduction of area cost factors (ACFs), the federal government is no closer to its goals of having construction cost estimates match actual construction costs, or properly adjusting for regional (location based) variances.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STOP using ACFs – The inherent flaws of Area Cost Factors

Job Order Contracting

As a result, more than 40 years after the introduction of area cost factors (ACFs), the Department of Defense (and the Federal Government in general) is no closer to its goals of having construction cost estimates match actual construction costs, or properly adjusting for regional (location based) and/or time-based cost variances.

article thumbnail

Action Needed to Increase the Reliability of Construction Cost Estimates

Job Order Contracting

Action Needed to Increase the Reliability of Construction Cost Estimates per the GAO. In all instances more effort is needs to efficiently and strategically manage our government owned built infrastructure from life-cycle and best value perspectives. GAO DOD Cost Estimating. Publicly Released: Mar 27, 2018.

article thumbnail

DoD FSRM, BUILDER SMS and the LEGACY of Wasteful Politics

Job Order Contracting

private interest sued the United States as a “bid protest to challenge the decision of the Department of Defense (“DOD”) to standardize its facility condition assessment needs through the Sustainment Management System (“SMS”)”2 2014: NNSA implements BUILDER with two pilots (Lawrence Livermore National Laboratory and Pantex Plant) 1 S.

Defense 182
article thumbnail

FEDRAMP is Hindering Facilities Management in the Federal Sector

Job Order Contracting

6 It important that commercial SaaS providers, and the associated infrastructure used to deploy SaaS products, meet appropriated compliance requirements for specified levels of security as developed by NIST. Our products are hosted on Microsoft AZURE, and Amazon AWS in the United States, both hosting infrastructures are FEDRAMP compliant.

article thumbnail

Defense Authorization Act rejects BRAC for 2017

BD+C

billion Defense Authorization Act. The legislation rejects the possibility of a base realignment and closure round (BRAC) in 2017, something both the Obama Administration and the Defense Department support. The House of Representatives has passed the $584.2 Legislation Codes and Standards'

Defense 45