Remove Definition Remove Feasibility Remove Industrial Remove Roads
article thumbnail

Definition of Design Period | Why Design Period is Provided | Factors Affecting Design Period | Design Period Values

CivilJungle

Definition of Design Period: Design period could be defined as the number of years in the near future in which the supply will surpass the demand. For the projects whose augmentation is unquestionably feasible, it’s generally kept low. Why Design Period Is Provided? Steel Pipes. 25 – 50 Years. Cast Iron Pipes. Concrete Pipes.

Design 52
article thumbnail

What Are Construction Cost Estimates | Types of Construction Cost Estimates | Purpose of Preparing a Cost Estimate

CivilJungle

There are different types of cost estimates that are generally used in the Construction industry are as follows. The approximate estimate will help to check the feasibility of the project. In the case of the roads and highways, the annual maintenance cost estimate is prepared to repair the patches, bridges, and culverts.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Behind the Build: Interview with Jon Turner, President and Principal Engineer, Phoenix Civil Engineering

Autodesk Construction Cloud

We see it in our roads, bridges, airports, and practically all public and private infrastructure projects. Our work consists of pipeline design, water, wastewater, recycled water, and storm drain systems; pump station designs, road rehabilitation projects. ’ Fact: civil engineering is everywhere. Now, we’re seeing similar trends.

Phoenix 52
article thumbnail

Bridging the Future of Construction: A Spotlight on 6 Young Changemakers 

Autodesk Construction Cloud

The construction industry is at a crossroads when it comes to finding talent. To alleviate the labor shortage and sustain the future of the industry in the long-term, construction needs to attract a new generation of passionate, diverse, and innovative professionals. Why are you inspired to pursue a career in the AEC industry?

article thumbnail

COVER STORY: 2013 Business Facilities Rankings Report – Metro And Global Rankings

Buisness Facilities Contributed Content

This public-private partnership with Louisiana Economic Development, IBM and LSU is a powerful example of the triangulation between industry, government and academia that elevates the state’s role as a national leader in economic development,” said Koubek. Total investment for the combined development is estimated to be $55 million.

Metro 110
article thumbnail

19 Different Types of Slabs in Construction | What Is a Slab

CivilJungle

Replacing a flat roof with a pitched roof on an existing structure is not always feasible. Not feasible for buildings with multiple levels or complex plans. Also, Read: What Is Superelevation | Superelevation Definition | Superelevation Formula | Calculation of Superelevation in Roads. Pre Tension Slab.

article thumbnail

Corporate Real Estate’s Role in ESG: Scaling High-Performance Buildings by Leveraging an Effective Real Estate Program

Stok

Embedded in the definition of ‘high-performance’ buildings are five core criteria that result in positive environmental, social, and financial impact for the business: Source: Stok. This early step creates the foundation of the program and can act as a compass for decision-making down the road. 5: Benchmark impact areas.