Remove Design Remove Engineering Remove Inspections
article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. Carried out nor more than two years after last general or principal inspection. After a major incident.

article thumbnail

How General Contractors Work with Commercial Architects to Mitigate Risks and Deliver Superior Commercial Construction Projects

HardHatChat

At Englewood Construction , early collaboration with architects is a cornerstone of our methodology, ensuring better project outcomes by aligning design intent with practical execution. This reduced design iteration times and streamlined permitting processes across multiple states, saving both time and money.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

STRENGTH EVALUATION OF CONCRETE BUILDINGS

The Constructor

How To Guide Non-Destructive Tests Structual Inspection Structural Engineering Structural Evaluation Loads on Structures Structural Analysis Structural Design' Physical load test is required to determine the serviceability of the structure. Load arrangements, load intensity, loading criteria, instrumentation.

article thumbnail

TYPES OF CONCRETE MIX DESIGN

The Constructor

IS 456-2000 has designated the concrete mixes into a number of grades as M10, M15, M20, M25, M30, M35 and M40. In this designation the letter M refers to the mix and the number to the specified 28 day cube strength of mix in N/mm2. For this reason, the minimum compressive strength has been included in many specifications.

Concrete 240
article thumbnail

ACCEPTANCE CRITERIA FOR DESIGN MIX CONCRETE

The Constructor

III Concrete which does not meet the strength requirements as specified in I, but has a strength greater than that required by II may, at the discretion of the designer, be accepted as being structurally adequate without further testing. times the standard deviation; and 2) 0.80 times the standard deviation; and 2) 0.80

Concrete 230
article thumbnail

Civil Engineering Marvels- 5 Tallest Skyscrappers

The Constructor

The building, designed by C.Y. Lee & partners and constructed primarily by KTRT Joint Venture and Samsung Engineering & Construction, is the world’s tallest completed skyscraper according to the CTBUH , the arbiter of tall building height. Taipei 101 received the Emporis Skyscraper Award in 2004.

article thumbnail

Early Collaboration: The Key to Commercial Construction Risk Mitigation

HardHatChat

Traditionally, GCs are brought into projects after the design is completed, but involving them earlier offers significant advantages that reduce risks and increase efficiency. Early Engagement for Improved Decision-Making Engaging GCs early provides Directors with critical insights that enhance the project’s overall design and feasibility.

Risk 156