Remove Design Remove Negotiation Remove Visualization
article thumbnail

Thinking outside the big box (store)

BD+C

Anthony Sanchez Retail Centers Shopping Centers Contractors Designers Designers / Specifiers / Landscape Architects Engineers Facility Managers Architects Building Owners For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures.

Retail 92
article thumbnail

Bargaining Room v. False Claims: 5 Tips for Negotiation of Construction Claims

Best Practices Construction Law

Earlier this week, a settlement was reached in dispute where the contractor and designer were alleged to have filed false claims with the U.S. The issue raises an important question: What should a contractor do during negotiations to allow for some “bargaining room” so as to avoid any appearance of filing a false claim?

Claims 69
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM for FM

Job Order Contracting

Distribution and sharing of information by the Facilities Management Team is crucial to achieving cost efficient and high performing facilities, however, 3-D BIM visualization and modeling software is generally very sophisticated, relatively expensive, and very complex. 8. Cost of implementation is insignificant versus cost savings.

BIM 100
article thumbnail

Surfing the Metaversity: The future of online learning?

BD+C

This shift will require an innovative approach to the design of both physical and virtual space and may drive a future state where architecture resembles game design. What does practice look like in Higher Education planning and design as the Metaversity ascends? No more squeaky floors or leaking roofs!

article thumbnail

5 ways ESG can influence design and create opportunities

BD+C

5 ways ESG can influence design and create opportunities 0 qpurcell Wed, 06/26/2024 - 11:14 Sustainability Gensler sustainability leaders Stacey Olson, Anthony Brower, and Audrey Handelman share five ways they're rethinking designing for ESG, using a science-based approach that can impact the ESG value chain. Photo courtesy Gensler 2.

Design 52
article thumbnail

Every Owner Should Implement JOC – JOB ORDER CONTRACTING – for Renovation, Repair, Sustainabilty, and Maintenance Construction Projects

Building Information Management

What’s Wrong with Design Bid Build? Traditional design-bid-build,DBB, is costly, antagonistic, and simply inefficient. The contract sets parameters such as the types of work that can be done, location of the work, design criteria and maximum amount of work to be awarded. fosters trust and mutual respect, 3.) Collaboration.

article thumbnail

How to plan your warehouse layout

The Korte Company

Not surprisingly, the price tag to build a warehouse has a major impact on how its floorplan is designed. This layout and design tool adds the cost component to drawings. For help, consult with racking system vendors early in the design process. Easy access to transit is non-negotiable. Planning ahead for future growth.

Plans 75