Beware of Using Assemblies for Job Order Contracting
Job Order Contracting
NOVEMBER 21, 2023
Each aspect, such as materials, labor, equipment, and overhead, should be itemized separately. Overhead and Profit: Factor in overhead costs and profit margins using the establish/accepted coefficient. Unit Costs: Assign a unit cost to each line item. This could be the cost per unit of measurement (e.g.,
Let's personalize your content