Remove Documentation Remove Drafting Remove Reference
article thumbnail

Auto Draft

FDR Safety

Documentation of infeasibility is extremely important because the Occupational Safety and Health Review Commission (OSHRC) has recognized feasibility when ruling on contested cases. Documentation of infeasibility is an effective tool when a three-column matrix with both OSHA and ANSI B11 criteria is used.

Drafting 156
article thumbnail

Have You Seen All the Contract Documents?

Construction Dive

Not surprisingly, these customized contracts tend to favor the drafting party. Sometimes, the other party never actually sees the document. The drafting party seeks to impose its terms through reference. What is disturbing is the lack of transparency.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

GBCI Changed its Name and You Need to Change Your Documents

Green Building Law Update

It will continue to be referred by the acronym GBCI. Members of the environmental industrial complex that deal in matters of LEED should review their contracts and other documents and update them now. Correctly referring to LEED certification is of paramount importance in legal opinions given in building acquisitions and financing.

article thumbnail

The Second Best Way to Mitigate Your Risk in Green Building

Green Building Law Update

The best way to mitigate risk in your green building project are properly drafted contract documents prepared by this law firm or by another attorney with green building experience. As I posted in this blog less than a year ago, Less than 20% of Green Building Contracts are Properly Drafted. The document is simply that good.

Green 153
article thumbnail

Autodesk Build Gets 25+ Product Updates, Features, and Enhancements

Autodesk Construction Cloud

Jump to release details by type: Document Management Releases. Save unfinished workflows as drafts. Visual enhancement to payment application document templates. Reference tables in detail reports. View references in iOS. Add RFI reference to photos . Document Management Releases. Cost Releases.

article thumbnail

An Introduction to the Different Types of Construction Drawings

Autodesk Construction Cloud

The term “construction drawings” refers to the collection of final preconstruction drawings that represent the building as a whole. The winning contractor is bound by all of the contract documentation, including the construction drawings. What Are Construction Drawings?

article thumbnail

Essential BIM Terminology

Viewpoint Construction Technology

Level 0 : Level 0 entails basically no collaboration, and only 2D CAD drafting is used. Level 1 : Level 1 BIM is a combination of 3D CAD and 2D for drafting. Data and documents are shared via a common data environment. Each stakeholder or contractor maintains their own data and documents. Project Information Model (PIM).

BIM 189