Remove Documentation Remove Inspections Remove Reference
article thumbnail

Why You Should Document Jobsite Safety Inspections

Construction Business Owner

They further require that an employer’s injury and illness prevention program must provide for “frequent and regular inspections of the jobsite” [reference 29 CFR 1926.20(b)(2)].'

article thumbnail

OSHA Alert: How to Prepare for an OSHA Inspection

FDR Safety

The most important step to take before an OSHA inspection even takes place is selecting a company representative. The company representative is the individual charged with representing the company’s interests during an OSHA inspection. Determining the type of inspection being conducted and the intended scope.

OSHA 156
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Construction documents help keep your projects organized and guide the construction process from start to finish. Having access to these construction documents puts information into the hands of the right people at the right time, so decisions can be made quickly and action can be taken to finish projects on time and within scope. .

article thumbnail

JOC Program Line-item Estimating

Job Order Contracting

inspecting 100 percent of labor, materials, and equipment used) as well as the coefficient/adjustment factor used, and the type, number, and cost of non-prepriced line-items. RSMeans Cost Data, This document is for construction cost reference information. Fully audit cost estimate and actual cost information.

article thumbnail

Construction quality management 101: Everything you should know

Lets Build

It also provides a quality control checklist to simplify the inspection process and ensure every aspect of the project has been checked. By doing so, it becomes a vital reference material during pre-task planning and discussions. It serves as a guide that helps them stay organised and focused on their assigned duties.

article thumbnail

Facilities Preventive Maintenance

Job Order Contracting

Manufacturer’s schedule for routine preventive maintenance, inspections, condition monitoring (predictive tests) and adjustments required to ensure proper and economical operation and to minimize repairs. Delineate procedures for preventive maintenance, inspection, adjustment, lubrication and cleaning necessary to minimize repairs.

Equipment 233
article thumbnail

What is new in ACI 301-20, Specifications for Concrete Construction

Construction Specifier

This standard specification establishes criteria for concrete construction that can be incorporated by reference into contract documents. When an architect or engineer (A/E) cites ACI 301, the document is intended to be adopted in its entirety into the contract documents. ACI 301 is written to the contractor.