Remove Documentation Remove Schedule Remove Transportation
article thumbnail

Stop Chasing Lien Waivers & Streamline Pay Apps

Construction Business Owner

Promote to rotator No Rotator Image Status of webinar Upcoming Discover how to standardize your schedule of values, application for payment processing, lien waivers and change orders. Central A lack of standardization for processing pay apps means SOVs, compliance documents, lien waivers, etc. Tue, 11/05/2024 - 12:00 1:00 p.m.

Lien 361
article thumbnail

Redefining Construction Document Management

Viewpoint Construction Technology

Aside from the obvious issues of being wasteful and bad for the environment, reliance on paper can lead to a host of other pitfalls : • Paper documents run a high risk of getting lost or misplaced, especially in the field. Documents on paper often get marked up in pen or pencil by field crews — often to the point of becoming unreadable.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How To Properly Transport A Crane

Construction Marketing

Transporting heavy machinery, like a crate, is no walk in the park. Such loads can be too heavy and difficult to transport using the traditional methods. Such loads can be too heavy and difficult to transport using the traditional methods. Choosing the right trailer for transporting a crane is vital to proper heavy hauling.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Federal, State, County, and Local Government, as well as Education, Healthcare and Transportation Departments and Agencies have a responsibility to create cost visibility and cost transparency and drive improved construction productivity. T The following figure, for example, was produced in 1972.

article thumbnail

FOUR PHASES OF PROJECT MANAGEMENT

The Constructor

In this phase you assemble your team and assign tasks to individuals, develop a budget for the project, develop a schedule and create a communications plan. It is kept in the mind that during the execution of the project, it is required to keep the process monitored for timely completion of the project, as per schedules.

article thumbnail

Commercial Construction Project Planning: 3 Warning Signs Your Budget Might Go Bust

HardHatChat

Clients may have not given their architect or engineer enough time to create a detailed set of documents; skimped on drawings assuming details will be decided along the way; or decided to skip an existing conditions survey altogether to save the cost. But in reality, the quality of plans we receive to work with at this stage varies widely.

Budget 337
article thumbnail

PUMPED CONCRETE PUMP TYPES & SELECTION

The Constructor

This method is used where large quantity of concrete work is involved at greater height, where other means of transporting is not easy to do. There are basically two types of concrete pumps used for transporting , they are: 1. Concrete pumps have been known for more than 50 years. Direct acting concrete pumps 2.

Concrete 240