Remove DOT Remove Drafting Remove Overhead
article thumbnail

Can We Make Home Building a Little Less ‘Interesting?’

Pro Builder

Sometimes it’s just vague specifications by your local drafting department, other times it’s the lumber/truss/panel operations that push it to the high side, and yes, often it is the engineers who are not taking the time to do fresh calculations on each home. That doesn’t make it right, and that doesn’t make you money. Apply technology.

Overhead 105
article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

The contractor’s coefficient is based on cost elements such as overhead, profit, minimum design costs, G&A expenses, bond premiums, and gross receipt taxes. Interagency usage can serve to reduce the overhead associated with multiple acquisitions. These contracts have much of their pricing determined by pre-award competition.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Application: This standard applies to warehouse or large overhead rolling doors. Door, Manual, Overhead. This standard applies to manually operated overhead doors. EPA/DOT approved refrigerant storage tanks. EPA/DOT approved refrigerant storage tanks. EPA/DOT approved refrigerant storage tanks. Fin comb 5.

article thumbnail

Ports And FTZs: Enter With Less Risk

Business Facilities

Businesses in an FTZ may see a reduction in duties on labor, overhead and profit. ERMCO, Firestone, NSK Steering Systems, Nortek, Dot Foods, PolyOne, Hexpol, Heckethorn Manufacturing, Colonial Diversified Polymers, SR Global, Royal Building Products, Rough Country and more. FTZs jumped 24.8 percent from the previous year, to $99.2

Risk 40