Remove Drafting Remove Railroad Remove Subcontracting
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 14 Subcontract Form – Stipulated Sum (design/bid/build or. 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build).

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Program regulations are currently being drafted to include the expanded definition for “Advanced Manufacturers.” Railroad Spurs. Sales & Use Tax Exclusion for Advanced Manufacturing Projects (SB1128) : Approved by the Governor during the 2012 legislative session, which expanded the scope of this program. TAX INCENTIVES.

Income 108