Remove Drawings Remove Fabrication Remove Green
article thumbnail

Waterproofing for a green roof

GCP Applied Technologies

Waterproofing for a green roof. Studies abound that green roofs reduce the effects of urban heat islands. Green roofs provide shade, comfort and a place to enjoy the greenery in an otherwise concrete jungle. The answer to "Why a green roof?" There is, however, some nuance to green roof projects. Phillip.fry@gc….

Green 94
article thumbnail

The Importance of Valves in Green Building

Constructonomics

My friend failed to explain exactly what she meant when she said she lived in a green house. I was thinking shades of green, not 20 watt light bulbs and a gravitational water supply that trickled at best. Three decades ago, going green was on the fringe. He craved attention. The house was another matter altogether.

Green 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Innovative Approaches to Industrial Construction Project Management

Construction Marketing

This has obviously led to large-scale improvements in the way structures are designed and building materials are fabricated. All stakeholders have access to the same files, documents, drawing, and models. As in all walks of life, technology and innovation are changing the landscape of the industrial construction industry.

article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

2) poor communication between the fabricators and erectors. (3) 8) inadequate preparation and review of contract and shop drawings. (9) 3) Bad workmanship, which is often the result of failure to communicate the design decisions to the persons, involved in executing them. (4) 9) poor training of field inspectors. (10)

Concrete 230
article thumbnail

FORMWORK AND GOOD FORMWORK PROPERTIES

The Constructor

Its importance is evident when you consider that the cost of fabrication, erecting and striking the formwork, often exceeds the cost of the concrete it is designed to shape and support. For anything other than most smallest of concreting jobs e.g. walls over 1m in height, a drawing should be provided, showing what formwork is required.

Concrete 223
article thumbnail

FIXING OF PRECAST CLADDING

The Constructor

The metal should have good workability but also keep its strength during fabrication. Green part in the drawing represent restraint fixing and blue part as load bearing fixing. Non standard materials are difficult to purchase and also very expensive.

Concrete 192
article thumbnail

Construction Business Owner Blogs

Construction Business Owner

Green Building. Drawings have been used by designers for centuries to communicate ideas to the construction trades. Until recently, those drawings were produced by hand, but in the last 25 years or so, computers have become the primary tool people use to produce construction documents. BIM & Pre-Fabrication.