What’s in a JOC Coefficient

Job Order Contracting

Here’s a listing of what is typically included in a construction contractor’s Job Order Contract coefficient… Contractor’s overhead and profit. Subcontractors’ overhead and profit. Employee payroll taxes, insurance, and fringe benefits. As built drawings. All waste and excess material. Quality control.

Overhead 100
article thumbnail

Understanding the Contractor’s Job Order Contract Coefficient

Job Order Contracting

Example include, general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, and contractor’s profit. Subcontractors’ overhead and profit. Employee payroll taxes, insurance and fringe benefits. As built drawings.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a) However, informal (shop) and as-built drawings, incidental to the job, reflecting the plan of action and the completed project, are anticipated under a JOC.

Contract 264
article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

f) “Job order contractor” – a licensed, bonded, and general liability insured contractor awarded a job order contract. (g) The proposal may also contain approved drawings, work schedule, permits, or other documentation as the organization may require for a specific job order. The prices shall not include overhead and profit.

article thumbnail

Job Order Contract Coefficient – Training 101

Building Information Management

Examples of costs that may be included in the coefficient include: General and administrative and other overhead costs. Employee payroll taxes, insurance and fringe benefits. insurance costs. subcontractor’s overhead and profit. insurance costs. subcontractor’s overhead and profit.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). ORGANIZATION NAME Technical Staff / Facilities Management Department Representative(s) and authorized ORGANIZATION NAME Procurement Authority review the Contractor’s Proposal. The UPB costs should NOT include contractor overhead and profit. Insurance, fringe.

Contract 100
article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Architectural drawings. Certificates of insurance. Insurance . 5: Drawings. Construction documents often include architectural drawings. Overhead costs. These documents essentially cover the full range of your business operations from the beginning of a project until the end. . Work orders. Safety reports.