Remove Drawings Remove Management Remove Omaha
article thumbnail

COVER STORY: Editors’ Location Picks

Buisness Facilities Contributed Content

a Miramar managed services provider to small businesses; and Blue Frog Solutions in Pompano Beach, a leading provider of middleware solutions for life insurance carriers, underwriters and their distributors and agents. Skilled Workforce Ready In Greater Omaha. Greater Omaha is home to the headquarters of nine Fortune 1000 companies.

Omaha 76
article thumbnail

Revit OpEd: Family Types Dialog - Lock Parameter

Revit OpEd

To lock a dimension directly in the drawing area, click next to the dimension.". This means that as the dimensions are moved in the drawing area, the associated parameters are constrained and the dimension value is preserved.". Note: Locked dimensions and their associated parameters cannot be changed in the drawing area.

Revit 66
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Behind the Build: Interview with Christian Waldo, VDC Manager at Lydig Construction

Autodesk Construction Cloud

As the VDC Manager at Lydig Construction , Christian has worked on numerous complex jobs and effectively leveraged digital solutions to excite folks about projects and enable teams to execute efficiently. Walk us through your career and what led you to becoming VDC Manager. Let’s dive in. came out.

article thumbnail

BC’s Blog December 08

Cassell Construction Estimating

However the current AIA Billings index is down to its lowest level since its origin fifteen years ago, and we know that if architects aren’t drawing, we surely won’t be building much in the near future. the primary reward to Operations is the introduction of Daily Field Reports to Project Management- a very welcome addition.

Sage 100
article thumbnail

Top 10 Construction Companies in the U.S.

Autodesk Construction Cloud

Location: Omaha, NE. Kelsey Stein, National Preconstruction Technology Manager at Skanska explains, “By having better standards that we can give to the design team, it’s helped us perform a closer estimation while saving time and money on our projects.”. Employees: 55,000. Revenue: $17.6 Founded: 1906. Location: Irving, TX.

article thumbnail

CAD Shack: East Coast CAD Kicks it up a Notch

CAD Shack

For those interested in seeing MEP Fabrication in action, taking system layouts from an engineering drawing in Revit MEP 2011 and converting the duct to manufacturable geometry, a live webinar presentation will take place on Wednesday, Jan. BIM Board of Omaha. BIM Manager. 1/17/2011 4:09 PM. Anonymous said. JUST SAYING.

CAD 40
article thumbnail

CAD Shack: Wire Gap when Wires Cross

CAD Shack

The Draw MEP Hidden Lines box is checked in the Electrical Setting s dialog. I am the BIM Manager for Alvine Engineering, a college instructor and the Revit MEP Content Manager for AUGIWorld Magazine. BIM Board of Omaha. BIM Manager. The View Discipline is set to Electrical. Todd Shackelford. at 3:42 PM.

CAD 40