Remove Drawings Remove Overhead Remove Schedule
article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a) However, informal (shop) and as-built drawings, incidental to the job, reflecting the plan of action and the completed project, are anticipated under a JOC.

Contract 264
article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Architectural drawings. A general schedule and timeline. 5: Drawings. Construction documents often include architectural drawings. 8: Construction Schedule. Every project you complete will have a schedule. 9: Schedule of Values. Some common kinds of construction documents include: Bidding documents.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOC Tutorial #71 – Terms

Job Order Contracting

k) “Project scope of work” – the document and related drawings, specifications, and writings referenced therein which together set forth the specific requirements and work to be accomplished by the job order contractor in connection with an individual job order. The prices shall not include overhead and profit.

article thumbnail

3 Ways to Take Construction Asset Tracking to the Next Level 

Autodesk Construction Cloud

spreadsheets) aren’t conducive to effective asset tracking because they lack features that enable real-time information sharing and integrations with other systems. And while project schedules are helpful, they’re often static and don’t contain the most updated project info. checklists, schedules, etc.),

article thumbnail

Solving the Labor Shortage in 12 Steps

Pro Builder

Many of those process deficiencies in areas such as scheduling, communication, and lack of POs were indeed hindering supplier/trade relationships, but there was one saving grace: Any invoice received by Monday was paid that same week on Friday, without fail. The result is tremendous variation in how homes are built, scheduled, and managed.

Schedule 119
article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

The construction industry uses different kinds of agreements depending on the project’s scope, delivery, schedule, budget, and the parties involved. They also include overhead costs such as insurance, mileage, a portion of your office rent. In other words, the contractor is incentivized for controlling costs and staying on schedule. .

article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Project cannot be expedited with a collaborative fast-track process; drawings and specs must be 100% complete to bid (though latter rarely occurs). Bid shopping can occur and actual overhead and profit amounts are unknown. Design changes can result in costly impacts to drawings or construction work in progress. Advantages.

Design 130