Remove Drawings Remove Overhead Remove Security
article thumbnail

Hard Construction Costs

Job Order Contracting

Landscape – Grass, lawns, trees, mulch, shrubs, fertilizer, and every other material included in the construction of the projects based on the architectural drawings. Overhead & Profit – Temporary facilities, utilities, tools and safety and security costs. How to Estimate Hard Construction Costs.

article thumbnail

Job Order Contract – Frequently Asked Questions

Job Order Contracting

There may be one or several co-efficients (normal hours, after hours, secure locations, remote locations, etc.). Should a UPB include overhead and profit? A UPB should reflect costs for a specific task without applying full overhead and profit. This should include participation in a joint site visit, sketches, drawings, etc.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Why You Need Integrated Construction Software

Viewpoint Construction Technology

The data has to be re-entered into their back-office system, which takes extra time and requires additional staff overhead. Field employees add notes, drawings, documents, photos, videos and voice messages to punch list tasks via a mobile device. You have more data breach points for IT to secure. Field staff time tracking.

Software 130
article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

They also include overhead costs such as insurance, mileage, a portion of your office rent. Designers also have more input in the construction drawing process, reducing the need for changes. . The GMP includes costs for labor, materials, overhead, and a percentage of those costs to generate a profit. That’s the “plus.” .

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). ORGANIZATION NAME Technical Staff / Facilities Management Department Representative(s) and authorized ORGANIZATION NAME Procurement Authority review the Contractor’s Proposal. The UPB costs should NOT include contractor overhead and profit. authorization. Job Conditions.

Contract 100
article thumbnail

Door Closer Hinges: A New Approach

Construction Specifier

Innovative engineering has made closer hinges more compact and functional; the new generation of products provides unique combinations of features and benefits to address door closing challenges that are not satisfactorily met by overhead surface-mounted door closers. Performance. The closer hinges have built-in door stops. Aesthetics.

article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Architectural drawings. 5: Drawings. Construction documents often include architectural drawings. Overhead costs. These documents essentially cover the full range of your business operations from the beginning of a project until the end. . Some common kinds of construction documents include: Bidding documents.