Remove Drawings Remove Overhead Remove Sewer
article thumbnail

Hard Construction Costs

Job Order Contracting

Site – All site work and underground, aerial, water systems, drains, fire, paving, grading, sewers, etc. Landscape – Grass, lawns, trees, mulch, shrubs, fertilizer, and every other material included in the construction of the projects based on the architectural drawings. How to Estimate Hard Construction Costs.

article thumbnail

First Home Checklist 2022

CivilJungle

Sewer ejector pump. Sewer Ejector Pump. Chest of draws for additional storage. Chest of the draw for additional storage. Water jug, Glasses or tumblers, Coasters, Salt and pepper shakers, Fruit bowl, Overhead light, Lazy Suzy, Bar essentials. Foundation of house. Doors & window condition. Sump pump details.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

All About of Plumbing Pipe Size Chart

CivilJungle

At first, we draw all the horizontal main lines, branch lines, and risers Then we calculate weight from table 1 and table 2 Then we specify water demand in gallons per millimeter. Piping Sizing Calculation – Capacity of a Sewer Pipe The capacity of an 8-inch sewer pipe with a decline of 0.5% 9.525 Lavatory 2 12.7

Sewer 98
article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CISP: Cast Iron Soil/sewer Pipe. DWG: Drawing. DWGS: Drawings. OH: Overhead. OHD: Overhead Door. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CIR: Circle, Circular, Circuit. CIRC: Circumference. CITG: Clear Insulating Tempered Glass. CJ: Control Joint.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CISP: Cast Iron Soil/sewer Pipe. DWG: Drawing. DWGS: Drawings. OH: Overhead. OHD: Overhead Door. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CIR: Circle, Circular, Circuit. CIRC: Circumference. CITG: Clear Insulating Tempered Glass. CJ: Control Joint.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

CISP: Cast Iron Soil/sewer Pipe. DWG: Drawing. DWGS: Drawings. OH: Overhead. OHD: Overhead Door. CHS: Chilled Water Supply. CI: Cast Iron. CIN BL: Cinder Block. CIP: Cast Iron Pipe, Cast-in-Place. CIR: Circle, Circular, Circuit. CIRC: Circumference. CITG: Clear Insulating Tempered Glass. CJ: Control Joint.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 01 33 23 Shop Drawings, Product Data, and Samples. 02 21 16 Measured Drawings. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Requirements.