New Asset Features to Boost Progress Tracking on 2D Drawings

Autodesk Construction Cloud

While project schedules are helpful, they’re often static and don’t contain real-time info on a project. With these new capabilities, you can visually markup 2D sheets and track asset progress to keep office teams updated while empowering folks in the field to forecast their productivity and quickly adjust to scheduling changes.

article thumbnail

3 Ways to Avoid Being Overwhelmed by Complex Schedule Changes

Autodesk Construction Cloud

It’s no wonder construction schedules get extremely complex and consist of thousands of schedule activities. As a Project Manager or Schedule Coordinator on the job site, you know that when one thing goes wrong, it’s a recipe for a series of problems to surface. Digitize and centralize your schedule management.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Preventive Maintenance

Job Order Contracting

Manufacturer’s schedule for routine preventive maintenance, inspections, condition monitoring (predictive tests) and adjustments required to ensure proper and economical operation and to minimize repairs. Also, list or reference the specific operation and maintenance procedures that must be performed to keep the warranty valid.

Equipment 233
article thumbnail

Construction blueprints 101: What you need to know

Lets Build

Construction blueprints (also known as construction plans or construction drawings) are two-dimensional drawings that contain all the details that are needed for a project. These details are needed to request permits, determine the construction schedule , and eventually do the construction itself. Blueprints may vary in size.

Drawings 139
article thumbnail

Revit OpEd: Measure Between Two References

Revit OpEd

Measure Between Two References. or you could draw a property line. Use the Measure Between Two Reference (MbTR) AND check the Chain Option! I can then produce a mass floor schedule to view the floor area. Reference Planes (families). Measure Between Two References. Revit OpEd. Tuesday, June 12, 2012.

Revit 65
article thumbnail

JOC TASK ORDER Process Overview – USACE

Job Order Contracting

When prices for lines are used that are not derived from the unit price book, they are noted and referred to as non-prepriced line items (NPP). The government will not provide the contractor with detailed Task Order drawings for projects that do not require a design. The government is responsible for developing the scope of work.

article thumbnail

How to Calculate Slab Steel Quantity from Drawing

CivilJungle

. • For cutting and bending purposes, schedules should be provided as separate A4 sheets and not as part of the detailed reinforcement drawings. • The form of bar and fabric schedule and the shapes of the bar used should be in accordance with BS 8666. • Bar Bending Schedule Required Ment Data. How to prepare a Slab BBS?