Remove Drawings Remove Reference Remove Structural Engineering
article thumbnail

Learn What’s New in Revit 2019 for Structural Engineers and Detailers

BIM & Beam

Benefit: This allows structural engineers and designers to design steel connections with a higher level of detail within the Revit environment. You can use a set of dedicated tools to create precise and detailed engineering drawings where steel connections are represented accurately. Documentation with steel details.

article thumbnail

What’s New in Autodesk Revit 2015 R2 for Structural Engineers

BIM & Beam

There are new features and enhancements in Autodesk Revit 2015 R2 dedicated especially to structural engineers. Snap to model lines for structural elements : To expedite and improve the modeling workflows, the following snapping enhancements are available for structural elements. 3D snapping has been enhanced.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Some crucial technical drawings terms in construction

Construction Cost Estimating

Given below the details lists of technical drawings terms essential at construction site. Tender drawings: These types of drawings are provided to the bidders at the tender time to estimate the blank BOQ. Tender drawings & specifications play an important role in the post contract phase to manage variations.

article thumbnail

BIM for Reinforced Concrete – From Design to Detailing in One Model

BIM & Beam

This is the third blog post in a series that discusses the advantages of working on concrete projects in a BIM process for structural engineers. Segmentation is dictated by engineering, architectural, or fabrication requirements, and its reinforcement is determined by the structural engineer.

article thumbnail

Reaching a new level of sophistication with panelized construction

Construction Specifier

With panelized construction, the structural elements are assembled in (typically) two-dimensional wall, floor, or roof components, referred to as panels, which may or may not be finished. It is important to note that choosing panelization has little effect on the design of the building by the structural engineer.

article thumbnail

Curtain wall design-assist: Navigating the process for success

Construction Specifier

In this case, a basis-of-design, commodity, stick-built curtain wall system can be shown on the architectural drawings and included in the performance specifications and can be competitively bid by the CM/GC after final construction documents are produced.

Design 93
article thumbnail

How To Prepare A Construction Plan

cnstrctr

The document is typically composed of the following: A narrative or written document outlining how the various components will be approached Drawings and illustrations indicating temporary construction and phasing Photographs and images A detailed or milestone construction schedule. Include a drawing of your site safety plan.

Plans 74