Remove Electrical Remove Leases Remove Roads
article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

Billion – Annual Operation Costs $7.92 – Average O&M Costs per Square Foot $27.49 – Average Lease Costs per Square Foot. Lease costs for leased assets are comprised of two sub elements: lease annual rent to lessor and lease annual operating and maintenance costs. million acres $16.5

Leases 100
article thumbnail

Singapore Re-imagines Ecological Urban Development

Natural Building

” The master plan will see the installation of electric vehicle charging stations and they are envisaging a future where autonomous vehicles and self-driving vehicles will become a reality. This will generate carbon dioxide savings equivalent to taking 4,500 cars off the roads each year.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The benefits and drawbacks of mixed-use development

The Korte Company

Unified electrical and water service. That’s aided by the longer-term leases developers can secure from commercial tenants. Depending on where these developments are planned, a municipality may have to improve roads, sewers and electrical services. Unified fire protection and site security service.

Finance 81
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

IBM Announces Creation Of 800-Job Technology Center In Downtown Baton Rouge

Buisness Facilities Contributed Content

At least 65 percent of these funds will be provided for expansion of the Computer Science Division of the School of Electrical Engineering and Computer Science at LSU. The riverfront complex is being built on the old Advocate newspaper site bordered by Main, North, Lafayette Street and River Road. The approximately $30.5

article thumbnail

All About of Construction Equipment | Types of Construction Equipment | Machines Used in Construction | Heavy-Duty Equipment

CivilJungle

Trencher used to dig trenches, especially for laying pipes or electrical cables, for installing drainage. A hoist can be operated manually or electrically and this is their biggest advantage. Road Rollers. Road Rollers. Road rollers are a very essential vehicles while constructing and repairing roads.

article thumbnail

South Carolina Incentives and Workforce Development Guide

Buisness Facilities Contributed Content

Economic Development Set-Aside Program: Assists companies in locating or expanding in South Carolina by providing financial assistance for road or site improvements and other costs related to business location or expansion. TAX INCENTIVES. The credit can be applied against either corporate income tax or the license fee. WORKFORCE DEVELOPMENT.