FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era
Buisness Facilities Contributed Content
SEPTEMBER 24, 2013
Major maritime shipping hubs including Los Angeles/Long Beach, Seattle/Tacoma and Oakland are ready to service the huge post-Panamax containers. Each crane weighs 1,550 tons and is fully electric so it emits no diesel emissions. They are fully electrical and powered by 13.2kV with provisions for back-up diesel power.
Let's personalize your content