Remove Electrical Remove Permits Remove Sewer
article thumbnail

Maryland Bans Polystyrene and Enacts 31 other New Environmental Laws

Green Building Law Update

Electric companies (utilities) and other electricity suppliers must submit renewable energy credits equal to a percentage specified in statute each year or else pay an alternative compliance payment equivalent to their shortfall. Water and Sewer Services. Clean Energy Jobs. Stormwater and Flood Management. Septic Systems.

Maryland 120
article thumbnail

A Zero Fossil Fuel House in Massachusetts

Natural Building

Two years later he and his partner Hannah got the occupancy permit on the very day their son, Max, was born. Spartan said, “I have not paid an electric or heating bill for seven years, since both the solar hot water and collectors generating electricity started running — just water/sewer, mortgage and taxes.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

Construction Equipments

The Constructor

A backhoe with a snow plow attachment clearing snow A worker attaches a lifting cable to a concrete sewer pipe section. In some parts of the world, road rollers are still known colloquially as steam rollers, regardless of their method of propulsion. This typically only applies to the largest examples (used for road-making).

Equipment 160
article thumbnail

Snapshots: 60 Seconds With Terry Gill, Kentucky Cabinet for Economic Development

Business Facilities

Build-Ready assures that utilities, zoning, permits and even a building pad are all taken care of before a company has made the decision to locate. Utilities—water, sewer, natural gas and electric—must also be in place and reach the property border.

article thumbnail

California Construction in the Time of Covid-19

Construction and Infrastructure Law

This is especially true given that the localities are the ones that issue permits, schedule inspections and sign-off on work. We have also heard from various localities that they will continue enforcing their local bans on any construction that does not squarely fit within an exemption of the local order.

article thumbnail

California Construction in the Time of Covid-19

Construction and Infrastructure Law

This is especially true given that the localities are the ones that issue permits, schedule inspections and sign-off on work. We have also heard from various localities that they will continue enforcing their local bans on any construction that does not squarely fit within an exemption of the local order.