Remove Engineering Remove Fabrication Remove Feasibility
article thumbnail

Are You Ready For An OSHA Audit?

FDR Safety

This blog is targeting small employers, especially those involved with sheet metal fabrication. are all operations that often do not allow use of engineered safeguards like two hand controls, light screens, etc. Over the past few years, FDRsafety has been asked to represent a disproportionate number of small metal fabricating plants.

OSHA 149
article thumbnail

Staying in control with fabric cladding

Construction Specifier

Tension fabric structures have served a key role as a cost-effective facility solution for years. In some cases, users have turned to fabric buildings when brick-and-mortar construction is not economically feasible or would take too long to complete. The fabric building market remained stable, but also stagnant, for a long time.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Conceptual Estimating is ideal for project feasibility study

Construction Cost Estimating

A well developed conceptual estimate is based on the study of historical project cost factors and result in forecasting rapid estimates & accurate cost for project feasibility studies, budgeting and financing the finished products, financial evaluation of a number of alternative projects etc.

article thumbnail

Curtain wall design-assist: Navigating the process for success

Construction Specifier

Technological advancements in curtain wall design tools, materials, prototyping, and fabrication techniques offer new avenues for achieving these lofty design and performance goals. The goal is to enhance the design’s feasibility, cost-efficiency, and functionality, while still maintaining the architect’s creative vision.

Design 104
article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Simplified Acquisition of Base Engineer Requirements (SABER) contracts provide a streamlined means to complete construction projects estimated at less than 750K. Contracting personnel and civil engineers are encouraged to adapt their SABER-like acquisitions and processes to meet their local needs and the local environment.

article thumbnail

Creating a sense of place with multipurpose K-12 school buildings

BD+C

By integrating high-performance materials and systems, we can mitigate any initial doubts about the feasibility and comfort of school MPRs, making these spaces compelling and practical for today’s future-focused schools. Today’s multipurpose room (MPR) designs have met those concerns head-on. Here are a few examples: Move walls to move minds.

Design 98
article thumbnail

More about design drawings and model planning

Construction Cost Estimating

Plans are like a set of drawings or two-dimensional diagrams that are used to narrate a place or object or to communicate building or fabrication instructions which are drawn or printed on paper and can take the form of a digital file. So these design drawings can be categorized as: • Feasibility studies. and many more.