Remove Engineering Remove Fabrication Remove Schedule
article thumbnail

Learn What’s New in Revit 2019 for Structural Engineers and Detailers

BIM & Beam

Building on Autodesk’s strategy to make Revit a robust model authoring tool for designing and detailing, the Revit 2019 release includes a number of new features that increase modeling versatility, accuracy, and productivity for engineers and detailers. We’re excited to share these features with you—take a look! Detailed Steel Design.

article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Steel: Steel is also used in pre-fabricated formwork. Purpose made steel forms are fabricated when dimensional tolerances are critical, or when the forms are planned to be re-used. Aluminium: Often used in pre-fabricated formwork, that is put together on site. waffle floors).

Materials 202
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Several Viewpoint Clients among ENR’s Best Construction Projects of 2017

Viewpoint Construction Technology

Engineering News Record recently revealed its list of the 20 Best Projects of 2017. DPR Construction, KT Fabrication and University Mechanical & Engineering. Two talented subcontractors and Viewpoint customers, KT Fabrication and University Mechanical & Engineering , were also involved on this $106.8-million,

Viewpoint 225
article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

Even experience in extensive design in academic context can provide only limited perspective in engineering decision making. Most lessons in engineering decision making come from the cases of histories of failures of structures, which itself are the results of a bad judgement, thus making us understand the pitfalls in conceptual design.

Concrete 230
article thumbnail

Innovative Approaches to Industrial Construction Project Management

Construction Marketing

This has obviously led to large-scale improvements in the way structures are designed and building materials are fabricated. This includes everyone from architects, engineers, contractors, and subcontractors. It streamlines scheduling. But it has also changed the way in which project managers do their jobs.

article thumbnail

CAD Shack: Everything about Revit Schedules

CAD Shack

Everything about Revit Schedules. The Schedule tool is found on the View tab of the ribbon and includes five types of schedules; Schedule/Quantities, Material Takeoff, Sheet List, Note Block, and View List. Schedule/Quantities. The Schedule/Quantities type produces a schedule of a selected family category.

article thumbnail

Panasonic Opens Engineering & Fabrication Center in Metro Dallas

Buisness Facilities Contributed Content

Panasonic Opens Engineering & Fabrication Center in Metro Dallas originally appeared on Business Facilities - Economic Development, Site Selection & Workforce Solutions. Building a high resolution videoboard at Panasonic’s new engineering and fabrication center in metro Dallas.

Dallas 40