Remove Environment Remove Modeling Remove Presentations
article thumbnail

Unlocking Success in AECO Projects: The Transformative Power of Collaboration

Construction Business Owner

Promote to rotator No Rotator Image Status of webinar Featured This presentation emphasizes the significance of genuine collaboration, sharing lessons learned in the office and field. This presentation emphasizes the significance of genuine collaboration, sharing lessons learned in the office and field.

BIM 358
article thumbnail

Circular Construction and Its Benefits

Job Order Contracting

The application of strategies such as integrated planning, procurement, and project delivery, and a regenerative model for materials reuse, design for disassembly, prefabrication, and recycling for reducing resource consumption and waste. What is circular procurement?

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Cost Knowledge Management

Job Order Contracting

Information must be presented in plain English, using industry standard terms and definitions, and organized in a standard data format (CSI Masterformat). The use of national average cost databases and/or location factors, or parametric cost models are insufficient. has proven relatively fruitless.

article thumbnail

The present and future of crisis mental health design

BD+C

The present and future of crisis mental health design 0 qpurcell Thu, 08/10/2023 - 10:07 Healthcare Facilities BWBR principal Melanie Baumhover sat down with the firm’s behavioral and mental health designers to talk about how intentional design can play a role in combatting the crisis. M Health Fairview Southdale Hospital, EmPATH Unit.

Design 97
article thumbnail

Productive Construction – Traits of Collaboration

Job Order Contracting

productive environment. Integrated Project Delivery: A Normative Model For Value Creation In Complex Military Medical Projects. The Effects of Building Information Modeling on Construction Site Productivity. Paper presented at the American Bar Association Meeting: Advanced Project Delivery: Improving the Odds of Success.

Products 205
article thumbnail

Debunking another BIM myth: FM enabled BIM models do not automatically pop out of Construction BIM models

DebunkTheBIM

In all mainstream BIM strategies, FM models sit at the end of the chain of Ds – numbered from the 6 th D onwards, following the 3 spatial Ds, cost and time. Waste of modelling efforts’ is a major ‘thing’ among those that know little of the realities of BIMming but are deeply invested into it.

BIM 78
article thumbnail

A Robust Framework for Improving Construction Productivity

Job Order Contracting

The core components of Integrated Project Delivery (IPD), for major construction, and LEAN Job Order Contracting (JOC), for repair, renovation, maintenance, and minor new builds, are now available within frameworks that include support services, information environments, and enabling collaborative technologies. Barrett, R. Brennan, M.

Products 149