article thumbnail

How to Create an Independent Government Cost Estimate

Job Order Contracting

Sole focus upon “rapid procurement” and or maintaining the ‘status quo’ are both barriers to efficient lifecycle management of the build environment. Contractor profit and overhead are NOT included. #4. Five primary questions to be answered are: 1. How was the estimate made? What assumptions were made?

article thumbnail

Outsourced Marketing vs. Staffing for Construction Companies

Construction Marketing

The latter taking on new urgency within a recessionary environment. Finally, consider that in today’s competitive environment, marketing has become the key determinant of success or failure. Every company has unique marketing requirements depending on size, scale of marketing activities, competitive environment, and other factors.

Overhead 220
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Guide to Eco-Friendly Construction

Construction Marketing

From leaving on lights and fans to using energy-inefficient appliances, we waste significant energy as heat in our environment. Invest in materials like energy-efficient overhead cranes, and consider using a suitable on-site generator. Buildings must be energy efficient. Use Prefabricated Material. Avoid Paper Blueprints.

article thumbnail

Valid Construction Cost Estimate Creation

Job Order Contracting

Common data environment. Limiting administrative burden and overhead. LEAN planning, procurement, and project delivery methods. Impacts of owner leadership, capability, and optimism. Roles and responsibilities. Ineffective cost management. Command and control issues. Improving productivity.

article thumbnail

Rethinking Job Order Contracts

Job Order Contracting

Unlike traditional construction procurement and project delivery, JOC operates optimally within an environment of mutual trust and respect, shared risk and reward, and a focus upon best value outcomes for all participants and stakeholders. The ability to build and understand detailed line item cost proposals and estimates is also required.

Contract 258
article thumbnail

Gateway of opportunity: Vertical-stacking doors in modern spaces

Construction Specifier

In response, door manufacturers are developing engineering and design features to serve a broader range of commercial environments. Compared to traditional sectional doors that use long ceiling tracks, hinges, or exposed cables for opening and closing, vertical stacking eliminates the need for unsightly, intrusive overhead hardware.

article thumbnail

Construction in the Metaverse – Is the Future Closer Than We Think?: Overhead in the Big Room

Autodesk Construction Cloud

If there is a way for people to make money (and there always is), then it has a future.” – Spencer Pursley, Critical Environment Engineer at QTS . Maybe the metaverse can make it more interactive, enabling people to operate a door or open up a ceiling access hatch and see what’s planned for the overhead space.