Contractors Are Renting Rather Than Buying More Equipment.

ENR Construction

Survey Schedule. Contractors Are Renting Rather Than Buying More Equipment During Slow Recovery. Equipment rentals allow contractors to shift downtime risk while trimming expenses, including licensing, insurance, taxes and debt, among others. This year, North American equipment rentals are expected to generate $33.5

article thumbnail

Reliable Construction Cost Estimating

Job Order Contracting

Each task should also have the following break downs and associated information (cost and descriptions as appropriate) for (1) labor, (2) material, (3) construction equipment. Construction supervision, and general office overhead, as well as any other costs should also be itemized separately. Learnings.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Viewpoint: The Case for Neutral, Third-Party Schedulers | ENR.

ENR Construction

Survey Schedule. Viewpoint: The Case for Neutral, Third-Party Schedulers. I was recently asked to participate in a debate on scheduling specifications at Stanford University. A representative from the contractor sponsoring the conference would take the position that most scheduling specifications were onerous or unnecessary.

article thumbnail

What are Preliminaries in Construction Contracts?

Lets Build

Preliminary costs in construction impact your entire project, and you’ll find that they cover a broad range of equipment, labour, and materials. Every construction project requires planning the work and creating and maintaining schedules, and it’s not possible to assign all of these prelim costs to just one work section.

Contract 144
article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

This practice does not work for material, labor, equipment, nor does it account for local market productivity in any effective manner. Locally researched JOC Price Books are readily available to provide cost visibility, cost transparency, and therefore improve cost management.

Contract 264
article thumbnail

The Rise of Business Intelligence in Construction

Viewpoint Construction Technology

Better tracking and analysis of things like material and equipment, labor deployment and costs for projects, productivity rates for various subcontractors and much more after the project can lead to intriguing post-mortem discussions.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). Scheduling.

Contract 100