article thumbnail

Façade Inspections Using Drones

The Constructor

It is estimated that around a million drones are being used today across the. Drones are being used widely in various work sectors of construction.

article thumbnail

INSPECTION OF A BRIDGE STRUCTURE - The Constructor

The Constructor

Hence, the bridge must be regularly inspected and maintained for the benefit of its users. There are three levels of inspection: 1. General inspection: Usual inspection of representative parts of a structure. General inspection: Usual inspection of representative parts of a structure.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

JOC Program Line-item Estimating

Job Order Contracting

. • NEVER accept a lump sum estimate for a workorder/project without a full detailed line-item estimate and review of line-times and quantities. Fully audit cost estimate and actual cost information. The post JOC Program Line-item Estimating appeared first on 4BT. Verify all aspects of the direct work (e.g.,

article thumbnail

Typical JOC Process

Job Order Contracting

Regular Updates and Inspections. Final Inspection. Owner may prepare an internal estimate (Internal Government Estimate (IGE), based upon regulations.). Owner/Client Proposal Review. Proposal Acceptance/Rejection. Owner/Client Notice to Proceed to Contractor. Preconstruction Kick-off Meeting. Construction Performed.

article thumbnail

Roof Inspection Checklists

Job Order Contracting

Roof Inspection Checklists can be automated and linked to detailed cost models for budgeting and project estimation. The post Roof Inspection Checklists appeared first on 4BT. How we help you achieve your goals. info@4bt.us.

article thumbnail

Timberline Software Support – Estimating Issues & Solutions

Cassell Construction Estimating

Timberline Software Support Issues Listed below are 4 common Timberline Estimating issues and their solutions. Issue: Attempting to open a Timberline Estimate, message appears, “File needs to be inspected”, followed by message, “File is corrupt” a. Reinstall Estimating. In almost all cases, this will re-link the files.

article thumbnail

Early Collaboration: The Key to Commercial Construction Risk Mitigation

HardHatChat

GCs can provide accurate estimates for labor costs, materials, and realistic timelines, allowing Directors to establish a reliable budget with contingencies for unforeseen circumstances.

Risk 156