Valid Construction Cost Estimate Creation

Job Order Contracting

Valid construction cost estimate creation is the goal of every professional estimator. Nonetheless validity of a construction cost estimate is critical to cost management. The management of a cost estimate involves updating costs with current data as it becomes available and revising the estimate to reflect changes.

article thumbnail

Unit Price Construction Cost Estimating

Job Order Contracting

Unit price construction cost estimating is the foundation of every reliable cost determination prior to procurement. Systems level estimating, historical data, assemblies, or square foot calculations should never be exclusively used to procure a repair, renovation, maintenance, or new build service. for the local market.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Cost Optimization

Job Order Contracting

Since other levels or types of cost estimating can’t meet this level, care should be given as to what form of cost data is being use. The base rate usually does not include overhead and profit, however, can be added later to ensure data integrity. General Conditions General overhead and profit can be added by percentage if desired.

article thumbnail

Reliable Construction Cost Estimating

Job Order Contracting

Reliable construction cost estimating is critical to the success of any repair, renovation, maintenance, or new build project. Reliable Construction Cost Estimating. While there may be several types of estimates in terms of granularity, this discussion is limited to detailed line item estimates. Learnings.

article thumbnail

Beware of Using Assemblies for Job Order Contracting

Job Order Contracting

A fundamental element is Job Order Contracting (JOC) is line item estimating which involves breaking down the cost of construction into discrete, granular tasks, each item representing a specific material, labor, and equipment components. Each aspect, such as materials, labor, equipment, and overhead, should be itemized separately.

Contract 194
article thumbnail

2020 Guide to Construction Cost Estimating

Job Order Contracting

2020 Guide to Construction Cost Estimating provides a road map for applying best management practices necessary to drive financial visibility and transparency. Since other levels or types of cost estimating can’t meet this level, care should be given as to what form of cost data is being use. Introduction. General Conditions.

article thumbnail

LEAN construction cost estimating

Job Order Contracting

LEAN Construction Cost Estimating Drives Optimal Performance. Currently available robust LEAN construction estimating, procurement, and delivery processes, services, and tools, make it possible to consistently deliver quality projects on-demand, on-budget, and on-time.