How to Create an Independent Government Cost Estimate

Job Order Contracting

What is an Independent Government Cost Estimate? An IGCE (also in construction related service an IGE) is a cost estimate developed by the Government Requiring Activity, based on the requirements of the Performance Work Statement (PWS) or Statement of Work (SOW). How was the estimate made? What assumptions were made?

article thumbnail

Comprehensive Unit Cost Database – Construction

Job Order Contracting

Comprehensive Unit Cost Database Easily estimate the any type of commercial repair, renovation, maintenance, or new build project. Move beyond square foot and parametric estimating Stop using inefficient processes and get Planning, Procurement, and Project Delivery Teams on the same page via r obust programmatic frameworks.

CSI 242
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Valid construction estimates

Job Order Contracting

Valid construction estimates are based on processes and procedures, however, most organizations rely upon dated, ineffective methods. Cost and time estimates are imperative to the success of any construction project, both during construction and throughout the project life. 2 Detailed line item estimating.

article thumbnail

Construction Cost Estimating Facts

Job Order Contracting

Construction Cost Estimating Facts Construction Cost Estimating Facts #1 There is no such thing as an “accurate cost estimate” Beware of any so called expert, estimating firm, or vendor using the term. #2 2 Construction cost estimating is NOT an art.

article thumbnail

Relearn Construction Cost Estimating – 4 Critical Learnings

Job Order Contracting

It’s time to relearn construction cost estimating. Before relearning construction cost estimating, it’s important to hit your resent button. Also remember that there so NO SUCH THING as an “accurate construction estimate.” The following represent the new realities. Technology will not solve your problems.

article thumbnail

Enhance Construction Cost Estimating – 5 Steps

Job Order Contracting

While we are all aware of the high levels of financial and environmental waste associated with the construction and sustainment of the built environment, very little has been done to address the issue at the root cause level. . What’s needed to improve construction cost estimating? Join the converstation and make a difference!

article thumbnail

DoD’s reliance on RSMeans for FSRM

Job Order Contracting

The DoD’s reliance on “RSMeans “for FSRM (Facilities Sustainment, Restoration, and Modernization) cost management, despite the availability of current and verifiable local cost data , likely stems from several historical and institutional factors: 1.