Remove Estimating Remove Risk Remove Tampa
article thumbnail

Judge Denies Tampa Bay Water a New Trial Against HDR | ENR.

ENR Construction

Order Your RISK FREE Subscription. Judge Denies Tampa Bay Water a New Trial Against HDR. The federal judge who oversaw the Tampa Bay Water v. Photo courtesy Tampa Bay Water. Tampa Bay Water sued HDR Engineering over cracks at its reservoir in Lithia, Fla. free e-newsletter. industry jobs. ENR: National Coverage.

Tampa 46
article thumbnail

Are You Ready for Build to Rent?

Pro Builder

Of the estimated 43.8 But recognizing an even greater opportunity, he pivoted to a dedicated rental community of 60 manufactured HUD-code homes near Tampa scheduled to break ground this month (see “ Manufactured to Rent ”). came across a piece of affordable land in Zephyrhills, 30 miles northeast of Tampa, a light bulb went off.

Phoenix 105
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Rising Tide

Buisness Facilities Contributed Content

The 2007 report declined to speculate on the potential impact of climate change–it included no estimate for the potential rise in sea levels. The study estimates present and future flood losses in 136 of the world’s largest coastal cities (including New York, Miami, New Orleans and Tampa in the U.S.).

Miami 49
article thumbnail

Job Order Contracting – Audit Results

Building Information Management

Job Order Contract Audit – City of Tampa JOC Audit – 2010. MD ANDERSON CANDER CENTER, Job Order Contracts, Strategic Area: Facilities Risk Type: Financial, Operational, Reputational, Audit Manager: Paul Pettit. From 50% to 75% 5 projects. From 75% to 99% 11 projects.

article thumbnail

Job Order Contracting – Audit Results

Building Information Management

Job Order Contract Audit – City of Tampa JOC Audit – 2010. MD ANDERSON CANDER CENTER, Job Order Contracts, Strategic Area: Facilities Risk Type: Financial, Operational, Reputational, Audit Manager: Paul Pettit. From 50% to 75% 5 projects. From 75% to 99% 11 projects.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The topics include the use of BIM in: student projects, interdisciplinary collaboration in studios, scheduling and estimating classes, IPD projects and facilities management. After several years in Atlanta, he currently resides in Tampa, Florida, with his wife and two sons. buildingSMART alliance Conference. Chris Moor, Chair.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The topics include the use of BIM in: student projects, interdisciplinary collaboration in studios, scheduling and estimating classes, IPD projects and facilities management. After several years in Atlanta, he currently resides in Tampa, Florida, with his wife and two sons. buildingSMART alliance Conference. Chris Moor, Chair.

BIM 40