Remove Fabrication Remove Materials Remove NCSBCS
article thumbnail

From mass masonry to veneer: The evolution of cavity wall design

Construction Specifier

Cavity ties include horizontal metal truss reinforcing spaced every third CMU course, and relieving angles are located at each floor with fabric flashing and weep holes above. At localized, smaller locations, the square footage of the repair area and materials replacement did not trigger the need to meet the energy code. 13 Ibid.

Design 64