article thumbnail

Feasibility Study For $3.6B Energy Storage Project Gets Feds' Nod

ENR Construction

FERC permit starts clock on proposed 2.2-GW GW project on Lake Powell near Page, Ariz.

article thumbnail

Energy Storage Feasibility Study Gets FERC Nod

ENR Construction

The permit gives the holder priority rights to further study and develop the site for the $3.6-billion billion Navajo Energy Storage Station.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Calif. Utility Giant Will Bury 10,000 Miles of High Fire-Risk Power Lines

ENR Construction

PG&E multi-year commitment to mitigation comes as it admits role in Dixie Fire start; effort could cost post-bankruptcy public firm $15-$20B and one research analyst notes high feasibility and permitting risks.

Risk 69
article thumbnail

7 Ways to Minimize Schedule and Budget Risks from Environmental Requirements

ENR Construction

Most transmission projects of any significance face risks to schedules and budgets at every step—from feasibility, siting, permitting and design to construction and operation.

article thumbnail

Property Development And Marketing Tips To Maximize Your ROI

Construction Marketing

Therefore, consider performing a feasibility study for a property development project. Also, be ready to pay fees for building permits, insurance, upkeep of existing structures like fence lines and drainage systems, and maintenance of construction equipment.

Income 156
article thumbnail

Kimley-Horn eliminates the guesswork of electric vehicle charger site selection

BD+C

Kimley-Horn has planned, designed, or permitted more than 15,000 EV chargers nationwide. Services include site selection, site feasibility assessment, site design, permitting, utility coordination, and more. Customized client-specific data.

article thumbnail

What is a ‘Site Survey’: Importance and Process

Building Radar

Site surveys are essential for ensuring that projects are feasible, compliant with regulations, and designed to meet the needs of stakeholders. This involves defining the survey’s objectives, selecting appropriate survey methods, and gathering necessary permits and approvals.

Site 52