Remove Inspections Remove Office Remove Sewer
article thumbnail

Prepping For Reentry: 8 Facility Maintenance Steps For Reopening Commercial Properties

HardHatChat

Here in Englewood Construction’s home state of Illinois, we are on track to move into Phase 3 of Governor Pritzker’s Restore Illinois plan at the end of the month, which will allow offices, manufacturing, retail and salons to reopen to the public under specific guidelines.

article thumbnail

RESIDENTIAL BUILDING SITE PLANNING

The Constructor

There should be good transport facilities such as railway, bus service, for going to office, college, market, etc. Civic services such as water supply, drainage sewers, electric lines, telephone lines, etc. The site should command a good view of landscape such a hill, river, lake, etc.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

First Home Checklist 2022

CivilJungle

Sewer ejector pump. Also, inspect the inside and outside of the home and know about every specific thing, like the presence of any tree near the structure because its roots cause a problem in the future for the structure. Sewer Ejector Pump. Inspect fiberglass or plastic containers for cracks, breaks, or damage.

article thumbnail

California Construction in the Time of Covid-19

Construction and Infrastructure Law

As another example, the City of Los Angeles expressly allows “construction of commercial, office and institutional buildings.” [4] This is especially true given that the localities are the ones that issue permits, schedule inspections and sign-off on work.

article thumbnail

California Construction in the Time of Covid-19

Construction and Infrastructure Law

As another example, the City of Los Angeles expressly allows “construction of commercial, office and institutional buildings.” [4] This is especially true given that the localities are the ones that issue permits, schedule inspections and sign-off on work.

article thumbnail

Rain check: How green roofs manage stormwater runoff

Construction Specifier

where the city is susceptible to the negative impacts of stormwater runoff and sewer overflow events, managing stormwater runoff is critical for protecting public health, the environment, and the citys infrastructure. In Washington, D.C., The redevelopment site The Parks at Walter Reed is a 26.71-ha

Green 52
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Inspect electrical power panel. Inspect control panel for loose connections. Inspect Bollard/Barricade coatings, decals and paint. Visually inspect for corrosion. Inspect general arrangement of door and mechanism, mountings, standards, wind locks, anchor bolts, counterbalances, weather stripping, door sweeps etc.