Remove Inspections Remove Permits Remove Reference
article thumbnail

What You Should Know Before Taking a Construction Loan

Construction Marketing

It covers land acquisition costs, building materials, construction permits, labor, contingency and interest reserves, closing costs, and plans. In addition to meeting traditional borrower standards, the lender will inspect and approve construction timeline estimates, proposed budget, and architectural plans.

article thumbnail

Facilities Preventive Maintenance

Job Order Contracting

Manufacturer’s schedule for routine preventive maintenance, inspections, condition monitoring (predictive tests) and adjustments required to ensure proper and economical operation and to minimize repairs. Delineate procedures for preventive maintenance, inspection, adjustment, lubrication and cleaning necessary to minimize repairs.

Equipment 264
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

4 Innovations Transforming Construction Safety 

Autodesk Construction Cloud

In construction, you may hear IoT referred to as telematics. Safety managers can document and inspect issues, and provide timely communications right from their smartphone or tablet while on the jobsite. The core solutions include Inspections, Training, JSAs, Observations, Incidents, Scan, and Forms apps. Mobile Software.

Safety 98
article thumbnail

Julian Construction Gives Basics On Finding A Contractor For Home.

Julian Construction

It was written by an industry professional, Shawn Kyles, who has inspected over 15,000 structures during his career. A contractor manages the entire project from start to finish, including architectural planning, securing any required building permits, as well as providing all of the materials, equipment and labor that will be needed.

article thumbnail

Construction blueprints 101: What you need to know

Lets Build

These details are needed to request permits, determine the construction schedule , and eventually do the construction itself. Today, the term blueprint is still casually used to refer to floor plans. But it is more acceptable to use the terms drawings and prints when referring to floor plans or any type of plan for that matter.

Drawings 139
article thumbnail

Facilities Preventive Maintenance

Job Order Contracting

Manufacturer’s schedule for routine preventive maintenance, inspections, condition monitoring (predictive tests) and adjustments required to ensure proper and economical operation and to minimize repairs. Delineate procedures for preventive maintenance, inspection, adjustment, lubrication and cleaning necessary to minimize repairs.

Equipment 130
article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

Impregnation refers to a technique for treating absorbent materials with chemicals. References. They should be included in the specification’s references section: • UL 723 (ASTM E84); • ASTM D3201; • ASTM D2898; and. Table 1: Code References for Selected FRTW Applications. Section 06 40 00 Architectural Woodwork.