Remove Insurance Remove Modeling Remove Negotiation Remove Overhead
article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). through discussions and negotiations. After agreement, a fixed-price bilateral order is prepared.

Contract 100
article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

Fringe Benefits - labor cost elements which are provided to pay for benefits received by workers, such as health insurance, pension, training, etc. Bond - in construction, a performance bond is a surety bond issued by an insurance company or a bank to guarantee satisfactory completion of a project by a contractor.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

8 Main Types of Construction Contracts

Autodesk Construction Cloud

They also include overhead costs such as insurance, mileage, a portion of your office rent. The GMP includes costs for labor, materials, overhead, and a percentage of those costs to generate a profit. Incentive contracts do require more negotiation to determine the incentives. That’s the cost part of the name.

article thumbnail

Job Order Contracting – Best Practices Implementation

Building Information Management

The Contractor shall furnish as part of its overhead cost, included in the coefficient, all necessary protective equipment, concrete mixing boxes, water barrels, wheelbarrows, hoes, shovels, tools, mortar boards, ladders, portable scaffolding, shop tools, hand tools, shop equipment, and fabricating items customary to the trade, etc.,

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 54 36 Building Information Modeling Exhibit. 00 62 16 Certificate of Insurance Form.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

design/negotiate/build). design/negotiate/build). 00 52 16 Agreement Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 52 17 Subcontract Form – Cost-Plus (design/bid/build or design/negotiate/build). 00 54 36 Building Information Modeling Exhibit. 00 62 16 Certificate of Insurance Form.