Remove Las Vegas Remove Security Remove Travel
article thumbnail

Project briefcases, part 2

GCP Applied Technologies

Las Vegas Airport. This meant not just providing a waterproofing system but a system that would secure joints and penetrations throughout the below-grade structure, since those areas have the highest vulnerabilities to water infiltration. Las Vegas Airport adopts GCP waterproofing solutions. Featured projects.

article thumbnail

What is the Largest Construction Project in the US Currently: An Overview

Building Radar

Estimated to cost $100 billion, this project includes: High-Speed Trains : Designed to reach speeds of up to 220 mph, reducing travel time significantly between cities. Environmental Impact : The rail system is designed to be an eco-friendly alternative to car and air travel. With a budget of $2.3

US 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Travel tips and advice for the US: How to annoy a security agent at a US airport

Construction Test

Decades ago, going through security was as simple as throwing your bags – everything still packed nice and neat – onto a scanner belt and then breezing through a metal detector. It’s no secret that going through the TSA security line is a drag. Not having your ID and boarding pass out.

Travel 26
article thumbnail

Mastering theme park construction coordination

The Korte Company

That secures the future of the theme park (and might form the basis of a long-term owner / contractor relationship in the process). The museum sits within Symphony Park and is an integral part of a greater master plan to revitalize downtown Las Vegas. The importance of clear communication.

article thumbnail

The Drone Age

Business Facilities

The two remaining sites were in the middle of heavily traveled air corridors in the East: New York’s Mohawk Valley and Virginia Tech (in a joint effort with Rutgers University in New Jersey). ” Gryphon Sensors is calling its project U-SAFE.

article thumbnail

How to plan your warehouse layout

The Korte Company

If possible, secure the services of the same Design-Builder for both the initial construction and the expansion. Postal Service Processing and Distribution Center in Las Vegas, Nevada, totaling 143,000 square feet. It’ll be as easy as picking up where you left off. Want to read more about our warehouse expansion experience?

Plans 75
article thumbnail

Builder of the Year Ivory Homes' Innovation Agenda

Pro Builder

Each year, a team of eight college interns is commissioned by Ivory Innovations to conduct research, including traveling and interviews, with prospective candidates. “What we’re looking for are innovative ideas that have the opportunity to scale and be picked up by different markets, and we want to support them,” Abby says.